Sewalls Falls Bridge
Owner: City of Concord NH
Projects Overview
In order to erect the new $10 million, 400 foot, 3 span bridge, ED Swett installed a 270’ work trestle in the Merrimack River to not only disassemble the existing 100-year-old 2 span truss but as well to construct the new bridge. The new piers sit on 6’ diameter drilled shafts that were installed 12’ into the river bedrock. Sections of the existing bridge were refurbished and erected in the Heritage Park adjacent to the new bridge. Sections of the existing granite block pier were used to construct the retaining wall at the southern abutment to allow the Riverwalk path to be constructed underneath the new bridge.
Project Details
Location: Concord, NH
Structure Type: 3 Span Bridge

8 Industrial Park Dr.
Concord, NH 03301
(603)-224-7401
NAICS Codes
Highway/Bridge/Street Construction:
237310
Other support activities for road transportation:
488490

8 Industrial Park Dr.
Concord, NH 03301
(603)-224-7401
NAICS Codes
Highway/Bridge/Street Construction:
237310
Other support activities for road transportation:
488490